In 2005 Jet approached astley as their nominated signage contractor and has since worked on over 300 sites. Having had previous experience of working on a roll out of 50 sites there was peace of mind they could trust astley provide a full service package. Jet’s main requirement was to re-image all of their existing sites, this required a varied level of service including:
• New builds - full new signage scheme working with architects & construction companies.
• Refurbishing existing sites - utilising any components possible to bring the image up to date.
• Maintenance - a full reactive package including same day call outs to faults & a 24hr help desk.
Also appreciating the long term advantages of energy and maintenance savings associated with modern LED installation, astley was instructed to convert Jet’s entire Totem range from pricing tiles to LED displays, requiring over 400 sites to be completed in 6 month.

.

.

.

.

.

.

.

we go that bit further with custom prototyping, conceptual design and implementation

In 2018 we were asked to help develop a new style of forecourt for Jet UK market. Using our superb in-house design team we set about researching and conceptualising possible approaches for styling of the forecourts that would push Jet forward in the UK market.
But we didn’t stop there! Having access to a fully equipped production facility meant that we were also able to construct a mini prototype for the client to visit in Gateshead which demonstrated the quality of all the proposed product and finishes. This allowed Jet the opportunity to inspect our workmanship and review a scaled version of the proposed forecourt before production commenced.

.

working safely


Our PFS installation crews, surveyors and project managers each hold SPA documentation authorising them to work on live petrol forecourts.
Our engineers are trained in all areas of health and safety standards and carry IPAF certificates for working with access equipment such as scaffolding and moving platforms , SPA Safety Passports for working in or near hazardous locations such as fuel stations, special licenses for driving and operating HIAB trucks and cranes, PASMA for mobile access equipment and first aid qualifications.
We have a dedicated installation department which schedules and coordinates the timetable of our engineers. Installations are programmed to coincide with the completion of manufacture and crews are nominated ahead of the project deadline.